Project Scope

Built for the Whitehaven Maules Creek Coal Mine. The design and fabrication was completed by 2012, the stacker was then moved into storage for 2 years before assembly and going into service in 2015. This long travel, luff and slew stacker serves the new Whitehaven mine near Gunnedah NSW. Scope of work included design, supply and site construction.

Schedule

Design and fabrication: 2012
Completion: 2015

  • Customer: Sedgman
  • Plant location: Maules Ck NSW, Australia
  • Product: Coal
  • COVA: Design-Project Management & Procurement
  • Haywards: Fabrication & Construction
  • Capacity: 1800 t/hr
  • Belt width: 1200mm
  • Outreach: 43.6m
  • Slewing range: =/- 100 degrees
  • Luffing range: +15 to -10 degrees
  • Stockpile width: 60.5m
  • Travel range: 505m
  • Rail gauge: 8m
  • Schedule: 2015